This site and is the restoration blog site for The City of Portsmouth Preserved Transport Depot web-site.
Thursday, 29 November 2012
5th November 2012 CTP200 Engine now back in
5th November 2012 CTP200 Engine now back in the Bedford OWB, after a struggle with the oil pressure it has now burst into life so hopefully will be back on the road once again soon.
Wednesday, 14 November 2012
12th November 2012 STP995 kit of parts
12th November 2012 as we finish fitting the ceiling panels we are now assembling the parts of our Jigsaw Puzzle and trying to identify what parts we are missing and where to fit the one's that we have found. We do have parts stored but we need to dig through them to find what we are missing for the moment.
Tuesday, 6 November 2012
5th November 2012 STP995 Interior updates
5th November 2012 STP995 Interior now has it ceiling panels fitted, progress is being made with the fitting of the window trims some of which still require painting. There is a few parts that we are trying to identify for fitting.
Tuesday, 23 October 2012
22nd October 2012 STP995 Interior progress
22nd October continuing with the re-installation of the Ceiling and Cove panels, we have started to reinstate the window trims which required some thought about how to fit these without removing the window glazing.
Thursday, 18 October 2012
15th October 2012 STP995 Fitting of the Ceiling
Work has now
recommenced with the refitting the Ceiling and Coving Panels, once the panels
and the beadings have been riveted in position.
The next task will be having the
panels spray painted in position once the preparation work is completed.
Wednesday, 8 August 2012
24th June 2012 RV3411 Southsea Running Day
RV3411 at our Southsea Running Day by Paul Knight
|
This is the first time in a number of years that CPPTD have
been able to display RV3411 to the public behind the D-Day Museum Southsea in June, at the end of each month on the last Sunday where they hold a running day,
it was previously a double deck bus converted to be used to inspect the Trolley
bus Overhead Cables and also able to tow Breakdowns back to the depots.
Monday, 6 August 2012
9th July 2012 RV3411 having a good clean.
9th July 2012 STP995 in progress
The Lower Deck is full of the part to complete it.
|
Rear view of the upper at the top of the stairs.
|
Looking forward on the upper deck just a good clean
required.
The staircase is being reassembled and is starting to
take shape, after many years of inactive work whilst in storage with its
previous owner. Hopefully now that the priorities of some of
the other projects have now been completed work can now recommence to complete
it. Although it does look like
there is a lot of work, the most important and major tasks have
been completed. The lower deck just needs to be reassembled and finished off
with a good paint job to match that of the upper deck &
the finial coat to the outside and it will look splendid once again.
Thursday, 26 July 2012
9th July 2012 DTP823 in progress
One of the new window pans that has been fabricated.
Looking towards the rear of the lower deck.
Looking forward in the lower deck with the new stress panels.
The staircase has been stripped of it's paintwork.
Looking forward on the top deck showing the attention
to the flooring.
Looking towards the back on top deck showing the attention to the flooring.
A more detailed view looking towards the back on top
deck showing the attention to the flooring.
Looking at the paneling on the upper deck before it's
removed.
Some of notices that were on the coving panels are still in place.
One
After many years of little work due to other on going projects and our relocations, CPPTD's week day crew have started to make a significant difference to 189's appearance. A set of window pans have now been fabricated at considerable cost, they do look the part and after a number of attempts to get them just right. The lower deck is now starting to take shape, the lower deck ceiling panels have now been removed and the upper deck has now been cleared of rubbish. A number of rotted flooring timbers have now been removed from around the flooring on the upper deck, also allowing access to the cabling for the lighting and bell circuits of the lower deck.
Wednesday, 25 July 2012
27th May 2012 LRV996 on the Open Top Service
This year CPPTD are changing our Sea Front Service for 2012, as Xelabus has registered a stage carriage Service along the Sea Front using an open top bus.
The New Service this year takes you through parts of Portsmouth that are not normally
cover.
Friday, 20 July 2012
11th July 2011 LRV996 work has progressed with the repairs
11th July 2011 work has progressed with the repairs to the Platform on LRV996 now that the framework and corroded panels have now been replaced, the replacement flooring has been cut to fit and other checks being carried out.
Subscribe to: