This site and is the restoration blog site for The City of Portsmouth Preserved Transport Depot web-site.
Tuesday, 23 October 2012
22nd October 2012 STP995 Interior progress
22nd October continuing with the re-installation of the Ceiling and Cove panels, we have started to reinstate the window trims which required some thought about how to fit these without removing the window glazing.
Thursday, 18 October 2012
15th October 2012 STP995 Fitting of the Ceiling
Work has now
recommenced with the refitting the Ceiling and Coving Panels, once the panels
and the beadings have been riveted in position.
The next task will be having the
panels spray painted in position once the preparation work is completed.
Subscribe to:
Posts (Atom)